HOW MUCH CONCRETE DO I NEED TO ORDER FOR MY PROJECT?

Share on facebook
Share on twitter
Share on linkedin

Concrete is measured in terms of yards. One yard of concrete equals 1 cubic yard.
The equation for a standard 4 inch slab is as follows:

Divide the square feet of the area you intend on pouring by 80.

Example:

  • 50 square feet divided by 80 = .62 yards of concrete.
  • 100 square feet divided by 80 = 1.25 yards of concrete.
  • 150 square feet divided by 80 = 1.87 yards of concrete.

Tool List:

  • Boots
  • Concrete
  • Tamper
  • Bull-float
  • Trowel
  • Concrete Broom

  • Sanderson Ford

Find Rosie-Certified Contractors in your area today

All contractors are Rosie-Certified for the state of Arizona.

Others Articles from Concrete
More Concrete Articles

Explore Other Categories

Display More
  • Sanderson Ford

Event Promotion Request

  • This field is for validation purposes and should be left unchanged.